Table 1 | Road Classification by Length | CY 2023
Classification | Length (kms.) | Percent (%) |
---|---|---|
BOHOL | 6,326.840 | 100% |
City Roads | 92.226 | 1% |
National Roads | 703.763 | 11% |
a. DPWH I | 238.751 | |
b. DPWH II | 216.488 | |
c. DPWH III | 248.524 | |
Provincial Roads | 958.250 | 15% |
Municipal Roads | 290.053 | 5% |
Barangay Roads | 4,282.548 | 68% |
Table 2 | Road Classification by Type of Pavement | CY 2023
Classification | Type of Pavement | ||||
---|---|---|---|---|---|
Asphalt | Concrete | Gravel | Earth | Total (kms.) | |
BOHOL | 178.794 | 2,473.809 | 2,578.945 | 1,095.292 | 6,326.84 |
City Roads | 10.543 | 72.573 | 9.11 | – | 92.226 |
National Roads | 112.297 | 587.971 | 3.495 | – | 703.763 |
a. DPWH I | 38.013 | 200.738 | – | – | 238.751 |
b. DPWH II | 46.180 | 170.308 | – | – | 216.488 |
c. DPWH III | 28.104 | 216.925 | 3.495 | – | 248.524 |
Provincial Roads | 30.705 | 632.810 | 294.735 | – | 958.250 |
Municipal Roads | 6.149 | 210.583 | 52.445 | 20.876 | 290.053 |
Barangay Roads | 19.100 | 969.872 | 2,219.160 | 1,074.416 | 4,282.548 |
Table 3 | Classification of Bridges in Bohol | CY 2023
Classification | Bridge Classification | ||||
---|---|---|---|---|---|
Timber | Bailey | Steel | Concrete | Total (LM.) | |
BOHOL | 108.500 | 568.820 | 2,293.400 | 5,440.32 | 8,411.04 |
City Bridge | – | – | – | – | – |
National Bridges | – | – | 1,481.37 | 3,629.70 | 5,111.07 |
a. DPWH I (40) | – | – | 450.46 | 595.0 | 1,045.51 |
b. DPWH II (66) | – | – | 402.29 | 1,410.19 | 1,812.48 |
c. DPWH III (85) | – | – | 628.62 | 628.62 | 2,253.08 |
Provincial Bridges (70) | 23.000 | 167.000 | 667.000 | 812.300 | 1,669.30 |
Barangay/Municipal Bridges | 85.500 | 401.820 | 145.030 | 998.320 | 1,630.670 |